Home Hsin Chong Group Services Projects Contact Us Site Map
   
   


 
 

Airport Freight Forwarding Centre (AFFC)

ACMV installation consists of nos of air-cooled chillers totalled 690 tonnes for the office tower and 6 sets staircase pressurization systems for the cargo freight stations.

     
 

Renovation and Extension to the Duchess of Kent Children Hospital

ACMV installation consists of total 71 tonnes Air Handling units, Primary Air unit, Fan coil units, Ventilation system, VRV air conditioning system and Building Automation system.

     
 

New Building - Block P of United Christian Hospital Extension

ACMV installation consists of 3 nos. air-cooled chillers totalled 990 tonnes. AHU, VAV / CAV, FCU, a central low pressure hot water plant, extract ventilation systems, and cold rooms for kitchen

     
 

Residential Redevelopment of N018A, La Salle Road

ACMV installation consists of VRV air conditioning system, Ventilation system.

     
 

A Primary School in Area 27 and A Primary and Secondary Schools in Area 101, Tin Shui Wai

ACMV installation consists of zero ozone depletion refrigerant type VRV with heat pump, split type air conditioning systems.

     
 

Australian International School

ACMV installation consists of one air cooled chiller with 150 tonnes for the Gymnasium Block and heat pump split type A/C unit for Academic Block.

     
 

New Operating Theatre of Queen Elizabeth Hospital

ACMV installation consists of 3 nos air cooled chillers totalled 1080 tonnes, AHU, FCU and mechanical ventilation.

     
 

Ruttonjee Hospital

ACMV installation consists of 3 nos. air cooled package screw type chillers totalled 525 tonnes, VAV, Building Automation system and venntilation system of tuberculosis ward. The demolition and diversion of existing building services were provided.

     
 

Chun Wah Road Indoor Game Hall-Phase 5(Pkg. C)

ACMV installation consists of 2 nos 175 kw cooling capacity DX AHU, 2 sets of 39 kw cooling capacity VRV complete with heat pump, desiccant type dehumidifier, mechanical ventilation and the associated electrical services, fire services and the renovation builders work.

     
 

Second Primary School in Area 31, Tin Shui Wai

ACMV installation consists of split type A/C unit fresh air pre-conditioner outdoor VRV units and indoor unit.

     
 

Cyberport Development - Contract C1

ACMV installation consists of sea water cooled centrifugal chiller plant totalled 8500 tonnes and screw type air cooled chiller plant totalled 250 tonnes.

     
 

Club Lusitano

ACMV installation consists of 267 tonne screw type air cooled chiller, water to water heat pump, AHU, mechanical ventilation and building management system.

     
 

KCRC - University Station Extension

ACMV installation consists of split type air-conditioning units.

     
 

Residential Development in TMTL 396

ACMV installation consists of air cooled chiller totalled 80 tonnes, AHU/PAU FCU for the Club House area and split type unit for the residential flat.

     
 

Residential Development in Cheung Muk Tao

ACMV installation consists of Multi zoning VRV type air conditioning, General Ventilation & Exhaust system for Refuse Collection Chamber and Vehicle exhaust system for carpark with gas detection system.

     
 

Fairmont Terrace

ACMV installation consists of air cooled heat pump with the cooling capacity 142 kW and heating capacity 147 kW, AHU and FCU for the Club House area, outdoor VRV and indoor units for the residential flat.

     
 

Residential Development at Aberdeen ATL 438.

ACMV installation consists of Single split type air conditioning system, and General Ventilation system

     
 

Residential Development at Siu Lam

ACMV installation consists of 2 nos air cooled screw type chillers totalled 228 tonnes for Clubhouse, self-contained dehumidification and heat recovery system for indoor swimming pool, Ventilation system, Single/Multi split type air conditioning system, Exhaust system for Refuse Collection Chamber and Vehicle exhaust system for carpark with gas detection system.

     
 

Residential Development at Liu To

ACMV installation of the single split type air conditioning system, and General Ventilation system.

     
 

Customs Building

ACMV installation consists of 4 nos air cooled chiller totalled 399 tonnes, PAU, FCU, ventilation for carpark area and store rooms and VRV for the Dog Kennel area.

     
 

Ocean Shore Phase I

ACMV installation consists of 3 nos. air cooled chiller totalled 379 tonnes, AHU and FCU for Club House, split type Air Conditioning Units for the entrance Lift Lobby, DIDW centrifugal fan, jet fan and jet nozzle for car park area.

     
 

The School of Public Health and Auditorium of Prince of Wales Hospital

ACMV installation consists of 3 nos. air cooled package screw type chiller totalled 519 tonnes, AHU/PAU, FCU, Ventilation system, VAV air conditioning system, Fume Extraction system associated with the aerodynamic fume cupboards and Building Automation system.

     
 

Oscar By The Sea - Phases I & II

ACMV installation consists of 2 nos. air cooled chiller totalled 230 tonnes, AHU/PAU and FCU and heat pump with cooling capacity 130 kW for the Club House area and split type A/C units for the residential flats.

     
 

Ocean Shore Phase II

ACMV installation consists of 3 nos. air cooled chiller totalled 379 tonnes, AHU and FCU for Club House, split type Air Conditioning Units for the entrance Lift Lobby, DIDW centrifugal fan, jet fan and jet nozzle for car park area.

     
 

Lady Ho Tung Hall - Hong Kong University

ACMV installation consists of 2 nos. air cooled chiller totalled 85 tonnes, AHU/PAU for the canteen and the hall

     
 

Student Hostels Phase I - City University of Hong Kong

ACMV installation consists of VRV A/C units, split and window types A/Cunits for mechanical ventilation plant rooms and toilets, and fresh air for the VRV A/C and split type A/C units.

     
 

The New Hong Kong International Airport

Mechanical installation consists of 6 Chillers @ 12,000 kW, 500 air Handling Units, 600 Fans, 650 Fan Coil Units, 11,000 Dampers, 3,500 Tonnes Ductwork, 58 Km Pipework (Largest 1.2m) and 14,000 Points BMS System.

     
 
 

Hsin Chong Aster Building Services, Limited - Hong Kong
Copyright 2004. www.hcaster.com. All Rights Reserved