Home Hsin Chong Group Services Projects Contact Us Site Map
   
   


 
 

Renovation and Extension to the Duchess of Kent Children Hospital

Electrical installation consists of 3 L.V. Main Switchboards, Nurse Call, PA, Intercom, Bedhead trunking, CABD, Burglar alarm and Security system.

     
 

New Building - Block P of United Christian Hospital Extension

Electrical installation consists of 1 no. 2500A L.V. Main Switchboard, 1 no. of 700 kVA emergency generator and fuel tank system, lighting, power ,earthing and lightning protection system, nurse call and emergency call system, bedhead trunking , CABD, CCTV, security system and public address system.

     
 

Residential Redevelopment of N018A, La Salle Road

Electrical installation consists of Power, Lighting, CCTV, Burglar Alarm and Video Door Phone and CABD system.

     
 

A Primary School in Area 27 and A Primary and Secondary Schools in Area 101, Tin Shui Wai

Electrical installation consists of 3 nos. 3,200A L.V. Main Switchboard, lightings and power systems, stage lighting and engineering work, extra low voltage call bell, class changing bell, video door phone, telephone public address, broadcast reception, computer network and earthing and lightning protection system.

     
 

New Operating Theatre of Queen Elizabeth Hospital

Electrical installation consists of 1800kVA generator with 60000L underground fuel tank, busduct, lighting, power, nurse call system, bedhead trunking and harmonic filter.

     
 

Ruttonjee Hospital

Electrical installation consists of A L.V. Main Switchboard, Transformer Room and Power supply.

The demolition and diversion of existing building services were provided.

     
 

Second Primary School in Area 31, Tin Shui Wai

Electrical installation consists of LV switchboard, power and lighting, video door phone, cabling facilities for computer network, security and alarm system and stage lighting system.

     
 

Cyberport Development - Contract C1

Electrical installation consists of 3,200A LV switchboards, standby / emergency generators with rating from 750 kVA to 1,500 kVA, UPS public address, SMARTV / BRI and emergency call bell system.

     
 

Club Lusitano

Electrical installation consists of incoming supply system, switchboard, generator set, main and sub-main distribution system, power supply to various services, general lighting and small power, earthing and lightning protection, telephone, CABD, PA and CCTV system.

     
 

Government Departmental Quarters

Electrical installation consists of lighting fitting, small power, main and sub-main power distribution.

     
 

SKH Nursing Home for the Elderly

Electrical installation consists of kVA Generator set, LV switchboard, lighting and power, nurse call system and bedhead trunking and ELV system.

     
 

KCRC - University Station Extension

Electrical installation consists of LV Switchboard, Generator set, lighting and power.

     
 

Hong Kong Polytechnic University Phase VI Development - 18 Storey Administration Block and Amenity Block

Electrical installation consists of LV Switchboard and one 1500kVA Generator Set, over 9000m flush floor trunking and ceiling trunking, lighting and power, landscape lighting.

     
 

Customs Building

Electrical installation consists of 1 no. 2500A LV Main cubicle, lighting, power, earthing, lightning protection, emergency call system, and security system.

     
 

The School of Public Health and Auditorium of Prince of Wales Hospital

Electrical installation consists of Power Supply System, Lighting System, PA System, Intercom system and CABD system. Fire Services installation consits of Fire Hydrant and Hosereel system, Sprinkler system, Automatic Fire Alarm system.

     
 

Lady Ho Tung Hall - Hong Kong University

Electrical installation consists of 2500A L.V. switchboard, 320kVA emergency generator, power and lighting, external lighting, radio and television, lightning protection, telephone and computer facilities and energy management system.

     
 

Student Hostels Phase I - City University of Hong Kong

Electrical installation consists of 2500A LV Switchboard, 910 kVA emergency generator, lighting, power, earthing, lightning protection, emergency call, CCTV and security, PA, Building monitoring, CABD, Carpark control, Smart card for A/C units and visitor panel system.

     
 

The New Hong Kong International Airport

Electrical installation consists of 60 Transformers, 20 Main LV Switchboards, 1,100 Distribution Boards, 80,000 Luminaires, 150 Km Cables and 2,500 Km Small Wiring.

     
 
 

Hsin Chong Aster Building Services, Limited - Hong Kong
Copyright 2004. www.hcaster.com. All Rights Reserved