Home Hsin Chong Group Services Projects Contact Us Site Map
     
     

   
 
 
 

Residential Redevelopment of N018A, La Salle Road

ACMV installation consists of VRV air conditioning system, Ventilation system.

Electrical installation consists of Power, Lighting, CCTV, Burglar Alarm and Video Door Phone and CABD system.

   

 
   
 

Government Departmental Quarters

Electrical installation consists of lighting fitting, small power, main and sub-main power distribution.

   

 
   
 

SKH Nursing Home for the Elderly

Electrical installation consists of nos of kVA Generator set, nos of A LV switchboard, lighting and power, nurse call system and bedhead trunking and ELV system.

   

 
   
 

Residential Development in TMTL 396

ACMV installation consists of air cooled chiller totalled 80 tonnes, AHU/PAU FCU for the Club House area and split type unit for the residential flat.

   

 
   
 

Residential Development in Cheung Muk Tao

ACMV installation consists of Multi zoning VRV type air conditioning, General Ventilation & Exhaust system for Refuse Collection Chamber and Vehicle exhaust system for carpark with gas detection system.

   

 
   
 

Fairmont Terrace

ACMV installation consists of air cooled heat pump with the cooling capacity of 40 tonnes and heating capacity 41 tonnes, AHU and FCU for the Club House area, outdoor VRV and indoor units for the residential flat.

   

 
   
 

Residential Development at Aberdeen ATL 438.

ACMV installation consists of Single split type air conditioning system, and General Ventilation system

   

 
   
 

Residential Development at Siu Lam

ACMV installation consists of 2 nos air cooled screw type chillers totalled 228 tonnes for Clubhouse, self-contained dehumidification and heat recovery system for indoor swimming pool, Ventilation system, Single/Multi split type air conditioning system, Exhaust system for Refuse Collection Chamber and Vehicle exhaust system for carpark with gas detection system.

   

 
   
 

Residential Development at Liu To

ACMV installation of the single split type air conditioning system, and General Ventilation system.

   

 
   
 

Ocean Shore Phase I

ACMV installation consists of 3 nos. air cooled chiller totalled 379 tonnes, AHU and FCU for Club House, split type Air Conditioning Units for the entrance Lift Lobby, DIDW centrifugal fan, jet fan and jet nozzle for car park area.

   

 
   
 

Oscar By The Sea - Phases I & II

ACMV installation consists of 2 nos. air cooled chiller totalled 230 tonnes, AHU/PAU and FCU and heat pump with cooling capacity 130 kW for the Club House area and split type A/C units for the residential flats.

   

 
   
 

Ocean Shore Phase II

ACMV installation consists of 3 nos. air cooled chiller totalled 379 tonnes, AHU and FCU for Club House, split type Air Conditioning Units for the entrance Lift Lobby, DIDW centrifugal fan, jet fan and jet nozzle for car park area.

   

 
   
 
 


Hsin Chong Aster Building Services, Limited - Hong Kong
Copyright 2004. www.hcaster.com. All Rights Reserved