Home Hsin Chong Group Services Projects Contact Us Site Map
     
     

   
 
 
 

A Primary School in Area 27 and A Primary and Secondary Schools in Area 101, Tin Shui Wai

ACMV installation consists of zero ozone depletion refrigerant type VRV with heat pump, split type air conditioning systems.

Electrical installation consists of 3 nos. 3,200A L.V. Main Switchboard, lightings and power systems, stage lighting and engineering work, extra low voltage call bell, class changing bell, video door phone, telephone public address, broadcast reception, computer network and earthing and lightning protection system.

   

 
   
 

Australian International School

ACMV installation consists of one air cooled chiller with 150 tonnes for the Gymnasium Block and heat pump split type A/C unit for Academic Block.

Fire Services installation consists of wet sprinkler, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers, pre-action system to serve Library and FM 200 Gaseous Extinguishing Total Flooding System.

   

 
   
 

Second Primary School in Area 31, Tin Shui Wai

ACMV installation consists of split type A/C unit fresh air pre-conditioner outdoor VRV units and indoor unit.

Electrical installation consists of nos of LV switchboard, power and lighting, video door phone, cabling facilities for computer network, security and alarm system and stage lighting system.

Fire Services installation consists of fire hydrant and hose reel system, automatic fire alarm and detection system and portable equipment.

   

 
   
 

Hong Kong Polytechnic University Phase VI Development - 18 Storey Administration Block and Amenity Block

Electrical installation consists of nos of A LV Switchboard and one 1500kVA Generator Set, over 9000m flush floor trunking and ceiling trunking, lighting and power, landscape lighting.

   

 
   
 

The School of Public Health and Auditorium of Prince of Wales Hospital

ACMV installation consists of 3 nos. air cooled package screw type chiller totalled 519 tonnes, AHU/PAU, FCU, Ventilation system, VAV air conditioning system, Fume Extraction system associated with the aerodynamic fume cupboards and Building Automation system.

Electrical installation consists of Power Supply System, Lighting System, PA System, Intercom system and CABD system.

Fire Services installation consits of Fire Hydrant and Hosereel system, Sprinkler system, Automatic Fire Alarm system.

   

 
   
 

Lady Ho Tung Hall - Hong Kong University

ACMV installation consists of 2 nos. air cooled chiller totalled 85 tonnes, AHU/PAU for the canteen and the hall; window type A/C units for student bedrooms, staff room and common room; VRV outdoor A/C units and indoor A/C units for large function rooms and split type A/C units for entrance lobbies and lan room.

Electrical installation consists of 2500A L.V. switchboard, 320kVA emergency generator, power and lighting, external lighting, radio and television, lightning protection, telephone and computer facilities and energy management system.

   

 
   
 

Student Hostels Phase I - City University of Hong Kong

ACMV installation consists of VRV A/C units, split and window types A/Cunits for mechanical ventilation plant rooms and toilets, and fresh air for the VRV A/C and split type A/C units.

Electrical installation consists of 2500A LV Switchboard, 910 kVA emergency generator, lighting, power, earthing, lightning protection, emergency call, CCTV and security, PA, Building monitoring, CABD, Carpark control, Smart card for A/C units and visitor panel system.

Fire Services installation consists of wet sprinkler, street fire hydrant, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers and automatic fire extinguisher unit for fuel tank room.

   

 
   
 

Student Hostels Phase II - City University of Hong Kong

This project includes Electrical, MVAC and Fire Services Installation for Units 4, 5, 6, 8 and Multi-Function Hall 2 of City University of Hong Kong.

Electrical installation consisting of switchboards, earthing and and lightning protection system, generator sets, PA, CABD, CCTV, BMS, Carpark Control, visitor panel security system, and computer cabling systems.

MVAC Installation consisting of air cooled split type VRV unit, air cooled split and window type A/C unit and mechanical ventilation system.

Fire Services Installation consisting of fire hydrant and hosereel system, automatic sprinkler system, and automatic fire detection and alarm system.

   

 
   
 

New Campus University - Lingnan University

   

 
   
 

Hong Kong Polytechnic University - Phase 7

Electrical and Fire Services Installation

   

 
   
 

City University Student Hostel - Phase 3

MVAC, Electrical and Fire Services Installation

   

 
   
 

Enterprise Centre Of Hong Kong University of Science and Technology

Fire Services Installation

   

 
   
 

Centralised Science Laboratories, Chinese University

Electrical Installation

   

 
   
 
 


Hsin Chong Aster Building Services, Limited - Hong Kong