Home Hsin Chong Group Services Projects Contact Us Site Map
 
   
   
   
   

     
 

 
 
Cyberport Development - Contract C1
   




   
    Services
 
    M&E Installation
    Location
 
    Telegraph Bay, Hong Kong
    Client
 
    Cyberport Ltd.
    Architect
 
    Wong Tung and Partners Limited
    Consulting Engineer
 
    Ove Arup and Partners Hong Kong Ltd.
    Main Contractor
 
    Meinhardt (M&E) Ltd.

Description of Works

 

ACMV installation consists of sea water cooled centrifugal chiller plant totalled 8500 tonnes and screw type air cooled chiller plant totalled 250 tonnes.

Electrical installation consists of 3,200A LV switchboards, standby / emergency generators with rating from 750 kVA to 1,500 kVA, UPS public address, SMARTV / BRI and emergency call bell system.

Fire Services installation consists of fire hydrant and hose reel, automatic sprinkler, automatic fire detection and alarm, FM 200 Gaseous Extinguishing System, Total Flooding System and pre-action systems.

Plumbing and Drainage installation consists of potable water supply, cleansing water supply, grey water, soil and waste disposal and rain water disposal (underground and above ground).

     
         


Hsin Chong Aster Building Services, Limited - Hong Kong
Copyright 2004. www.hcaster.com. All Rights Reserved