Home Hsin Chong Group Services Projects Contact Us Site Map
 
 








Australian International School
Services ACMV and Fire Services Installation
Location Kowloon Tong, Kowloon, Hong Kong
Client Australian International School
Architect Design Consultants Limited
Consulting Engineer Meinhardt (M&E) Ltd.
Main Contractor Leighton Contractors (Asia) Ltd.
Description of Works

ACMV installation consists of one air cooled chiller with 150 tonnes for the Gymnasium Block and heat pump split type A/C unit for Academic Block.

Fire Services installation consists of wet sprinkler, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers, pre-action system to serve Library and FM 200 Gaseous Extinguishing Total Flooding System.