Home Hsin Chong Group Services Projects Contact Us Site Map
 
   
   
   
   

     
 

 
 
Australian International School
   




   
    Services
 
    ACMV and Fire Services Installation
    Location
 
    Kowloon Tong, Kowloon, Hong Kong
    Client
 
    Australian International School
    Architect
 
    Design Consultants Limited
    Consulting Engineer
 
    Meinhardt (M&E) Ltd.
    Main Contractor
 
    Leighton Contractors (Asia) Ltd.

Description of Works

 

ACMV installation consists of one air cooled chiller with 150 tonnes for the Gymnasium Block and heat pump split type A/C unit for Academic Block.

Fire Services installation consists of wet sprinkler, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers, pre-action system to serve Library and FM 200 Gaseous Extinguishing Total Flooding System.

     
         


Hsin Chong Aster Building Services, Limited - Hong Kong
Copyright 2004. www.hcaster.com. All Rights Reserved