Home Hsin Chong Group Services Projects Contact Us Site Map
 
   
   
   
   

     
 

 
 
Club Lusitano
   




   
    Services
 
    M&E Installation
    Location
 
    Ice House Street, Central, Hong Kong
    Client
 
    Club Lusitano
    Architect
 
    Da Rosa Warner Architects
    Consulting Engineer
 
    MCW Consultants Ltd.
    Main Contractor
 
    Michael Chang and Associates

Description of Works

 

ACMV installation consists of 267 tonne screw type air cooled chiller, water to water heat pump, AHU, mechanical ventilation and building management system.

Electrical installation consists of incoming supply system, switchboard, generator set, main and sub-main distribution system, power supply to various services, general lighting and small power, earthing and lightning protection, telephone, CABD, PA and CCTV system.

Fire Services installation consists of fire hydrant and hose reel system, automatic sprinkler system, automatic drencher sprinkler system for refuge floor, automatic fire detection and alarm system.

Plumbing and Drainage installation consists of potable water supply, cleansing water supply, A/C make up water supply, soil and waste disposal and rain water disposal.

     
         


Hsin Chong Aster Building Services, Limited - Hong Kong
Copyright 2004. www.hcaster.com. All Rights Reserved