Airport Freight Forwarding Centre (AFFC)

ACMV installation consisting of nos of air-cooled chillers totalled 690 tonnes for the office tower and 6 sets staircase pressurization systems for the cargo freight stations.

     
 

KCRC - University Station Extension

ACMV installation consists of split type air-conditioning units.

Electrical installation consists of nos of A LV Switchboard, nos of kVA Generator set, lighting and power.

Fire Services installation consists of fire pump and pipeworks and AFA System.

Plumbing and Drainage installation consists of water pump, pipeworks and above ground drainage pipe.

     
 

The New Hong Kong International Airport

The New Hong Kong International Airport was a massive project that Hsin Chong Aster Building Services Ltd. decided to involve its European associates Aster SpA and Ellis Mechanical Services Ltd. to form the AEH Joint Venture to win the 'super' M&E package that included all four elements of the M&E installation (air conditioning, electrical, fire protection systems and hydraulic services).

     
 

The Hong Kong Side's Passenger Terminal Building - Shenzhen Western Corridor

This project includes Electrical, MVAC and Plumbing and Drainage Installation

     
 
 

Hsin Chong Aster Building Services, Limited - Hong Kong