Home Hsin Chong Group Services Projects Contact Us Site Map
   
   


 
 

Residential Redevelopment of N018A, La Salle Road

ACMV installation consists of VRV air conditioning system, Ventilation system.

Electrical installation consists of Power, Lighting, CCTV, Burglar Alarm and Video Door Phone and CABD system.

     
 

Government Departmental Quarters

Electrical installation consists of lighting fitting, small power, main and sub-main power distribution.

     
 

SKH Nursing Home for the Elderly

Electrical installation consists of nos of kVA Generator set, nos of A LV switchboard, lighting and power, nurse call system and bedhead trunking and ELV system.

     
 

Residential Development in TMTL 396

ACMV installation consists of air cooled chiller totalled 80 tonnes, AHU/PAU FCU for the Club House area and split type unit for the residential flat.

     
 

Residential Development in Cheung Muk Tao

ACMV installation consists of Multi zoning VRV type air conditioning, General Ventilation & Exhaust system for Refuse Collection Chamber and Vehicle exhaust system for carpark with gas detection system.

     
 

Fairmont Terrace

ACMV installation consists of air cooled heat pump with the cooling capacity of 40 tonnes and heating capacity 41 tonnes, AHU and FCU for the Club House area, outdoor VRV and indoor units for the residential flat.

     
 

Residential Development at Aberdeen ATL 438.

ACMV installation consists of Single split type air conditioning system, and General Ventilation system

     
 

Residential Development at Siu Lam

ACMV installation consists of 2 nos air cooled screw type chillers totalled 228 tonnes for Clubhouse, self-contained dehumidification and heat recovery system for indoor swimming pool, Ventilation system, Single/Multi split type air conditioning system, Exhaust system for Refuse Collection Chamber and Vehicle exhaust system for carpark with gas detection system.

     
 

Residential Development at Liu To

ACMV installation of the single split type air conditioning system, and General Ventilation system.

     
 

Ocean Shore Phase I

ACMV installation consists of 3 nos. air cooled chiller totalled 379 tonnes, AHU and FCU for Club House, split type Air Conditioning Units for the entrance Lift Lobby, DIDW centrifugal fan, jet fan and jet nozzle for car park area.

     
 

Oscar By The Sea - Phases I & II

ACMV installation consists of 2 nos. air cooled chiller totalled 230 tonnes, AHU/PAU and FCU and heat pump with cooling capacity 130 kW for the Club House area and split type A/C units for the residential flats.

     
 

Ocean Shore Phase II

ACMV installation consists of 3 nos. air cooled chiller totalled 379 tonnes, AHU and FCU for Club House, split type Air Conditioning Units for the entrance Lift Lobby, DIDW centrifugal fan, jet fan and jet nozzle for car park area.

     
 

Student Hostels Phase I - City University of Hong Kong

ACMV installation consists of VRV A/C units, split and window types A/Cunits for mechanical ventilation plant rooms and toilets, and fresh air for the VRV A/C and split type A/C units.

Electrical installation consists of 2500A LV Switchboard, 910 kVA emergency generator, lighting, power, earthing, lightning protection, emergency call, CCTV and security, PA, Building monitoring, CABD, Carpark control, Smart card for A/C units and visitor panel system.

Fire Services installation consists of wet sprinkler, street fire hydrant, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers and automatic fire extinguisher unit for fuel tank room.

     
 

Student Hostels Phase II - City University of Hong Kong

This project includes Electrical, MVAC and Fire Services Installation for Units 4, 5, 6, 8 and Multi-Function Hall 2 of City University of Hong Kong.

Electrical installation consisting of switchboards, earthing and and lightning protection system, generator sets, PA, CABD, CCTV, BMS, Carpark Control, visitor panel security system, and computer cabling systems.

MVAC Installation consisting of air cooled split type VRV unit, air cooled split and window type A/C unit and mechanical ventilation system.

Fire Services Installation consisting of fire hydrant and hosereel system, automatic sprinkler system, and automatic fire detection and alarm system.

     
 
 

Hsin Chong Aster Building Services, Limited - Hong Kong
Copyright 2004. www.hcaster.com. All Rights Reserved