Home Hsin Chong Group Services Projects Contact Us Site Map
   
   


 
 

A Primary School in Area 27 and A Primary and Secondary Schools in Area 101, Tin Shui Wai

ACMV installation consists of zero ozone depletion refrigerant type VRV with heat pump, split type air conditioning systems.

Electrical installation consists of 3 nos. 3,200A L.V. Main Switchboard, lightings and power systems, stage lighting and engineering work, extra low voltage call bell, class changing bell, video door phone, telephone public address, broadcast reception, computer network and earthing and lightning protection system.

     
 

Australian International School

ACMV installation consists of one air cooled chiller with 150 tonnes for the Gymnasium Block and heat pump split type A/C unit for Academic Block.

Fire Services installation consists of wet sprinkler, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers, pre-action system to serve Library and FM 200 Gaseous Extinguishing Total Flooding System.

     
 

Second Primary School in Area 31, Tin Shui Wai

ACMV installation consists of split type A/C unit fresh air pre-conditioner outdoor VRV units and indoor unit.

Electrical installation consists of nos of LV switchboard, power and lighting, video door phone, cabling facilities for computer network, security and alarm system and stage lighting system.

Fire Services installation consists of fire hydrant and hose reel system, automatic fire alarm and detection system and portable equipment.

     
 

Hong Kong Polytechnic University Phase VI Development - 18 Storey Administration Block and Amenity Block

Electrical installation consists of nos of A LV Switchboard and one 1500kVA Generator Set, over 9000m flush floor trunking and ceiling trunking, lighting and power, landscape lighting.

     
 

Lady Ho Tung Hall - Hong Kong University

ACMV installation consists of 2 nos. air cooled chiller totalled 85 tonnes, AHU/PAU for the canteen and the hall; window type A/C units for student bedrooms, staff room and common room; VRV outdoor A/C units and indoor A/C units for large function rooms and split type A/C units for entrance lobbies and lan room.

Electrical installation consists of 2500A L.V. switchboard, 320kVA emergency generator, power and lighting, external lighting, radio and television, lightning protection, telephone and computer facilities and energy management system.

     
 

New Campus University - Lingnan University

     
 

Hong Kong Polytechnic University - Phase 7

Electrical and Fire Services Installation

     
 

City University Student Hostel - Phase 3

MVAC, Electrical and Fire Services Installation

     
 

Enterprise Centre Of Hong Kong University of Science and Technology

Fire Services Installation

     
 

Centralised Science Laboratories, Chinese University

Electrical Installation

     
 
 

Hsin Chong Aster Building Services, Limited - Hong Kong
Copyright 2004. www.hcaster.com. All Rights Reserved